|
Laying Teal Turf
Start by unrolling one strip width of turf around the perimeter of the lawn. Avoid using small pieces at the edges as these can dry out and perish. Ensure that the underside of the new turf has full contact with the soil below.
Lay the next strip across the longest straight run and continue to work across the lawn, strip by strip, staggering roll end joints similar to brickwork. Working off boards helps to avoid footmarks.
Butt adjoining edges and ends against each other, but avoid stretching the turf. Overlapping pieces and ends of rows should be cut off neatly with a sharp knife or half-moon lawn edger. |
|
Watering
Water the newly laid lawn within half an hour of installation, ensuring new turf is never allowed to dry out. This is especially important during the spring, summer and autumn months. Watering using a hose and sprinkler should be repeated at least once a day until the roots are established. The hotter, drier or windier the weather, the more water will be needed. Water immediately on any sign of turf drying out e.g. gaps, lifting, browning or curling. Some or all of the watering may not be required in the winter months.
|